MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Berkshire Chamber     MCLA     City Statistics    
Search
Hoosic River Measurements Taken by Army Corps of Engineers
05:52AM / Friday, August 02, 2024
Print | Email  

NORTH ADAMS, Mass. — A team of surveyors from the U.S. Army Corps of Engineers was in the city last week to collect hydrology measurements along the north, south and main reaches of the Hoosic River.
 
The survey is part of the three-year, $3 million feasibility study of the flood control chutes being undertaken in agreement with the city and the Hoosic River Revival.
 
The concrete panels that line the chutes have been decaying for years and several have already fallen into the river. While the system saved the city from periodic catastrophic floods, the chutes are now seen as unsightly, ecologically destitute, and in dire need repair or restoration. 
 
The Hoosic River Revival has been advocating for a more modern and environmental solution to flooding risks that will also highlight the river as a recreational resource. 
 
The Flood Risk Management Project is looking at the six miles of the North and main branches of the river and 3.5 miles of the South Branch.
 
The study's objectives are to reduce risks to life, health and property associated with Hoosic flooding; reduce the risk of the flood control's failure; improve community resilience; reduce the risk of flooding economically disadvantaged communities and historic properties; and increase the quantity or quality of the river habitat. 
 
Measurements taken last week are to identify the quantity and quality of water moving through the chutes during the year and will be used to predict what might happen in the river with modernization of the flood chutes, and without any change in the chutes. This work is expected to improve the reliability of the Corps' flood management designs that were discussed last fall with the North Adams community. 
 
Mayor Jennifer Macksey, members of her staff, and Hoosic River Revival met with the Corps of Engineers team to discuss the data and extensive technical studies the Corps is undertaking in order to evaluate the modernization options. Upon completion of the multi-year study, the Corps will recommend a modernizing plan for the deteriorating flood control system.  
 
Later this fall, the city and HRR will again offer public meetings for the community to learn about the study's progress and to share their thoughts about activities they would like to have in and around the river. 
 
0Comments
More Featured Stories
NorthAdams.com is owned and operated by: Boxcar Media 102 Main Sreet, North Adams, MA 01247 -- T. 413-663-3384
© 2011 Boxcar Media LLC - All rights reserved