MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Berkshire Chamber     MCLA     City Statistics    
Search
Final Phase of the Flushing of Pittsfield's Water System
08:07AM / Friday, September 29, 2023
Print | Email  

PITTSFIELD, Mass. — Monday, October 2 marks the final phase for the fall flushing schedule of Pittsfield's water system. 
 
Water mains throughout the city will be flushed through hydrants to remove accumulations of pipeline corrosion products. Mains will be flushed Monday through Friday, between the hours of 7:30 a.m. and 3 p.m.
 
The upcoming flushing for this week may be expected to affect the following areas:
  • Cascade and Churchill streets.
  • West Street from Fort Hill Avenue west including Meadow Ridge Drive, Lillybrook Road, and Westbrook Terrace.
Although flushing may cause localized discolored water and reduced service pressure conditions in and around the immediate area of flushing, appropriate measures will be taken to ensure that proper levels of treatment and disinfections are maintained in the system at all times. 
 
If residents experience discolored water, they should let the water run for a short period to clear it prior to use.
 
If discolored water or low-pressure conditions persist, please contact the Water Department at (413) 499-9339.
0Comments
More Featured Stories
NorthAdams.com is owned and operated by: Boxcar Media 102 Main Sreet, North Adams, MA 01247 -- T. 413-663-3384
© 2011 Boxcar Media LLC - All rights reserved