MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Berkshire Chamber     MCLA     City Statistics    
Search
Hundreds Oppose Pipeline Project at FERC Scoping Session
By Andy McKeever, iBerkshires Staff
03:11AM / Wednesday, July 29, 2015
Important
0
Interesting
0
Funny
0
Awesome
0
Infuriating
0
Ridiculous
0

PITTSFIELD, Mass. — Natural Gas distributor Kinder Morgan filed some 6,500 pages of environmental reports on Friday.   On Tuesday, residents filled the Taconic High School auditorium to tell federal regulators their concerns about the environmental impacts of Kinder Morgan's proposed Northeast Energy Direct pipeline project.   "These documents are massive with highly technical and important information," said state Rep. Paul Mark at the Federal Energy Regulatory Commission scoping session.   He said the documents that were submitted contain omissions of critical importance and it is "simply impossible" for stakeholders to have reviewed them in

2 Comments
>> Read More

Environmentalists, Solar Industry Push For Net Metering Increase
By Andy McKeever, iBerkshires Staff
02:14PM / Monday, July 20, 2015
Important
1
Interesting
0
Funny
0
Awesome
0
Infuriating
0
Ridiculous
0

PITTSFIELD, Mass. — Utility companies have nearly hit the statewide net-metering cap and now environmentalists and the solar industry are pushing to raise it again.   Net metering is a program that requires utility companies to buy unused energy produced by alternative or sustainable energy. The cap limits the amount the utility is required to buy from the sources and is currently around 5 percent of the total generation.   Photovoltaic energy has been the most popular use of net metering and, in 2008, the state has several times over the past half-dozen years increased the power generation eligibility for net metering.   With utility companies buying all that they are

2 Comments
>> Read More

Kinder Morgan Shrinks Pipeline Size; Public Hearings Scheduled
By Andy McKeever, iBerkshires Staff
01:12AM / Saturday, July 18, 2015
Important
0
Interesting
0
Funny
0
Awesome
0
Infuriating
0
Ridiculous
0

PITTSFIELD, Mass. — Kinder Morgan is prepared to move forward with the proposed natural gas pipeline through the Berkshires, albeit the plan is for a somewhat smaller size.   On Thursday, Kinder Morgan announced it will continue with the permitting process for the Northeast Energy Direct Project, a 30-inch (down from 36 inches) pipeline from New York state through the Berkshires to Dracut. The project is a $3.3 billion investment in which the company says would cure a shortage of energy in New England.   "We are excited that the market path component is moving forward and a determination now has been made on mainline capacity for the project, which is specifically

2 Comments
>> Read More

Page 4 of 4 1  2  3  4  
NorthAdams.com is owned and operated by: Boxcar Media 102 Main Sreet, North Adams, MA 01247 -- T. 413-663-3384 F.413-664-4251
© 2011 Boxcar Media LLC - All rights reserved